The ASI will be closed from midday on Thur 19 Dec 2024 until 6 Jan 2025.
The ASI will be closed from midday on Thursday 19 December 2024 until Monday 6 January 2025.
Membership options for companies: Fabricators, Professionals, Distribution Centres.
Membership options for individuals, students and academics.
Unsure about becoming an ASI member or which type you should choose?
ASI Members can access exclusive deals with our new motoring package
Read more about what the ASI does for your industry.
Find out more about the ASI and who we represent.
Purchase books, download tech notes and request library resources.
Read the latest steel industry news or book in for a webinar or our upcoming Steel Convention
Related Content
On the bearing strength of bolts in clearance holes
High clearance scaffold systems during construction- 1. Structural modelling and modes of failure
High clearance scaffold systems during construction- II. Structural analysis and development of desi
Deformation behaviour of pinned connections with large pin clearance. (Technical Notes)
Pin clearance effect on pinned connection strength (Technical Notes)
Regenerative design for building engineering
Analytical and numerical analysis on a new type of of bolted connection for modular construction
Designing for torsion in open section steel members
Adoption of Design for Manufacturing Assembly in Prefab Construction
Please do not press back or reload the page.